icon Skip to content
Find stone for home and garden in our big campaign! Up to 30% discount
Sweden's largest selection of stone for your home & garden - Fast home deliveries throughout the country
Uteplats kanonbacken

Patio Kanonbacken

The beginning of retaining wall and wall

The pictures are from before the retaining wall and the wall were in place

Picture before

Picture before

basic

Clear!

Time to do the walks around the house

Times were made see the pictures before picture and how it turned out

Role model

Joining

Entrance food cellar

Place for bicycles

Walk at the entrance

Lamps on the wall

The lamps have now been installed on the wall.

Seeing the wall from the street

The lights from the neighbor's side

LED lights are now on the wall

Lamp on close-up

Mini granite staircase

A migranite staircase was drilled to get up to our new wooden staircase and then to get to the patio door

First it must be drained

Preparation

First step in place

Almost finished

Finally a finished staircase

Wall at the entrance

Backfill wall must be made before the passage can be made.

Role model

Foreclosure must be done before construction can begin

Under construction

Under construction

Finished!

Previous article From pallets to welcome entrance